Archive: 31/03/2014

Pateke-4H drilling update 25 March

Posted on 31 March 2014

At 06:00 this morning (NZDT) the Pateke-4H development well sidetrack was at a measured depth of 3,845 metres and directionally drilling ahead with a 12 ¼ inch drilling assembly, the operator has advised.

Read the full post