Kisaran Exploration Well progress report 16th September

Posted on 16 September 2013

At Sunday, 15 September, seven inch casing had been run and cemented at the Parit Minyak-3 (PM-3) well, located in the Kisaran PSC in onshore Sumatra, Indonesia.

The current operation is continuing drilling to 9000 ft using a 5 7/8" inch bit.

New Zealand Oil & Gas Ltd has a 22.5 per cent stake in the joint venture through its subsidiary NZOG Asia Pty Ltd. The Kisaran Joint Venture partners are Pacific Oil & Gas (55 per cent and Operator) and Pacific Oil & Gas (Sumatera) Ltd, a subsidiary of Bukit Energy Inc. (22.5 per cent).

Attachment: News Release