Archive: 09/10/2018

Kohatukai Weekly Drilling Update

Posted on 9 October 2018

At 6.00AM on 8 October 2018, the Kohatukai-1 well had reached a depth of 1974 metres.

The current operation is drilling directionally with a 12 ¼” hole.

Read the full post