Archive: 30/12/2013

Matuku-1 weekly progress report December 30

Posted on 30 December 2013

As at 6.00AM Sunday, 29 December, the Matuku-1 well in PEP 51906 offshore Taranaki had been drilled to 3167 metres after setting 13 3/8” casing at 1494 metres.

Read the full post