The Diamond Ocean Apex rig has completed its work scope and departed the Ironbark-1 well location at mid-night Monday 11th January 2021 (AWST). This will be the last update on the Ironbark-1 well operations.

Read the full post

Ironbark Operations Update

Posted on 8 January 2021

Plug and abandonment operations continue as planned at the Ironbark-1 well location in WA-359-P located in the North Carnarvon Basin.

Read the full post

Ironbark Intersects Target

Posted on 29 December 2020

The Ironbark-1 well in WA-359-P located in the North Carnarvon Basin, off the North West coast of Australia, has intersected its primary target interval at a depth of 5275 metres and, as planned, continued drilling to intersect the remaining sands. No significant hydrocarbon shows were encountered in any of the target sands.

Read the full post

Ironbark Weekly Drilling Update #8 As At 22 December 2020 (NZ Time).

Posted on 23 December 2020

As at 06:00 22 December 2020 (AWST) the Operator has advised that the Ironbark-1 well had reached a measured depth of 5202 metres and we are currently preparing to case and cement. In the past week the Operator completed drilling the 12¼“ hole.

The next update will be made on the 31st December 2020.

Read the full post

Ironbark Weekly Drilling Update #7 As At 17 December 2020 (NZ Time).

Posted on 18 December 2020

As at 06:00 17 December 2020 (AWST) the Operator has advised that the Ironbark-1 well had reached a measured depth of 4380 metres and they are currently drilling the 12¼“ hole. In the past week the Operator completed the 13-5/8” casing and cementing job. They also completed a BOP pressure test.

Read the full post

Ironbark Weekly Drilling Update #6 As At 10 December 2020 (NZ Time).

Posted on 11 December 2020

As at 06:00 10 December 2020 (AWST) the Operator has advised that the Ironbark-1 well had reached a measured depth of 4362 metres and are currently preparing to run casing and cement. In the past week the Operator completed drilling the 16½" hole.

 

Read the full post

Ironbark Weekly Drilling Update #5 As At 3 December 2020 (NZ Time).

Posted on 4 December 2020

As at 6:00 3 December 2020 (AWST) the Operator has advised that the Ironbark-1 well had reached a measured depth of 3801 metres and is continuing to drill the 16½” hole. In the past week we continued to drill the 16½" hole.

Read the full post

Ironbark Weekly Drilling Update #4 As At 26 November 2020 (NZ Time)

Posted on 27 November 2020

As at 6:00 26 November 2020 (AWST) the Operator has advised that the Ironbark-1 well had reached a measured depth of 3040 metres.

Read the full post

Ironbark Weekly Drilling Update #3 As At 19 November 2020 (Nz Time).

Posted on 20 November 2020

As at 6:00 18 November 2020 (AWST) the Operator has advised that the Ironbark-1 well had reached a measured depth of 2410 metres.

Read the full post

Ironbark Weekly Drilling Update #2 As At 12 November 2020 (Nz Time).

Posted on 13 November 2020

As at 6:00 11 November 2020 (AWST) the Operator has advised that the Ironbark-1 well had reached a measured depth of 1811 metres.

 