Archive: 18/12/2020

Ironbark Weekly Drilling Update #7 As At 17 December 2020 (NZ Time).

Posted on 18 December 2020

As at 06:00 17 December 2020 (AWST) the Operator has advised that the Ironbark-1 well had reached a measured depth of 4380 metres and they are currently drilling the 12¼“ hole. In the past week the Operator completed the 13-5/8” casing and cementing job. They also completed a BOP pressure test.

Read the full post