Archive: 23/12/2020

Ironbark Weekly Drilling Update #8 As At 22 December 2020 (NZ Time).

Posted on 23 December 2020

As at 06:00 22 December 2020 (AWST) the Operator has advised that the Ironbark-1 well had reached a measured depth of 5202 metres and we are currently preparing to case and cement. In the past week the Operator completed drilling the 12¼“ hole.

The next update will be made on the 31st December 2020.

Read the full post