Archive: 13/11/2020

Ironbark Weekly Drilling Update #2 As At 12 November 2020 (Nz Time).

Posted on 13 November 2020

As at 6:00 11 November 2020 (AWST) the Operator has advised that the Ironbark-1 well had reached a measured depth of 1811 metres.

 

Read the full post