Archive: 11/12/2020

Ironbark Weekly Drilling Update #6 As At 10 December 2020 (NZ Time).

Posted on 11 December 2020

As at 06:00 10 December 2020 (AWST) the Operator has advised that the Ironbark-1 well had reached a measured depth of 4362 metres and are currently preparing to run casing and cement. In the past week the Operator completed drilling the 16½" hole.

 

Read the full post