Archive: 07/01/2014

Matuku-1 weekly progress report January 7

Posted on 7 January 2014

As at 6:00AM Monday, 6 January, the Matuku-1 well in PEP 51906 offshore Taranaki had been drilled to 3417 metres. 9 5/8” casing has been run to 3409 metres and cemented. The current operation is running in 8 ½” drilling assembly to commence drilling the next section to a planned total depth of 4754m.

Read the full post