Archive: 08/04/2014

Pateke-4H drilling update 8 April

Posted on 8 April 2014

At 06:00 this morning (NZST) the Pateke-4H remains at a measured depth of 4,083m BRT (below rotary table), and the 9 5/8 inch casing has been installed and cemented with the shoe at 3,669m BRT.

Read the full post