Archive: 17/06/2014

Oi-2 progress report 17 June

Posted on 17 June 2014

The Oi-2 well in Petroleum Mining Permit 38158, offshore Taranaki, New Zealand, has been drilled to the planned section target depth of 550 metres with a 17 ½ inch hole, the operator has advised.

Read the full post