Archive: 08/04/2015

Production begins at Pateke-4H well

Posted on 8 April 2015

The subsea tie-back and installation project to connect the Pateke-4H well to the Tui area oil fields in PMP 38158 has been successfully completed and oil production has commenced, the operator has advised.

Read the full post