Archive: 02/10/2018

Kohatukai Weekly Drilling Update

Posted on 2 October 2018

At 5.00PM on 1 October 2018, the Kohatukai-1 well had reached a depth of 647 metres in the first
week of drilling operations, the operator has advised.

Read the full post