Archive: 01/12/2022

Palm Valley 12 well commenced flowing sales gas

Posted on 1 December 2022

Central Petroleum Limited (“Central”) (ASX: CTP) advises that the Palm Valley 12 (PV12) well has been tied-in and commenced flow testing on 28 November 2022. After a period of ramp-up the well flowed at a stable, wellhead skid-limited rate of ~10TJ which exceeded pre-drill expectations.

Read the full post